Professional Industrial Valves Manufacturer

Pneumatic tee internal thread ball valve installation method

by:Mech     2020-08-07
Pneumatic tee internal thread ball valve installation steps: ( 1) Take the pneumatic tee internal thread ball valve flange on both sides of the protection cover, under the Industrial Valves fully open state to wash clean. ( 2) Before installation should be in accordance with the provisions of signal, Electric or pneumatic) The engine test ( Prevent because of transportation vibration impact performance) , qualified rear can install ( According to the electric actuator wiring diagram wiring) 。 ( 3) Connected to the pipe before, you must wash and clean the pipe residual impurities ( These substances may damage the seat and the ball) 。 ( 4) Internal thread ball valve in the pneumatic tee during installation, please don't use valve actuator part as a lifting of the lifting point, in order to avoid damage the actuator and accessories. ( 5) Pneumatic three-way internal thread ball valve should be installed in horizontal or vertical direction of the pipeline. ( 6) Installed near the point of pipeline with low or bear the phenomenon of external force, can use a pipe support or support to eliminate the deviation of pipelines. ( 7) After connected to the pipe, please use cross locking flange bolt torque.
Shenzhen Mech Valve Trading Co., Ltd. has an array of branches in domestic for servicing customers with high-quality products.
For more tips and strategies on effective os & y valve fire protection solutions, get your choice at Mech Valve.
Shenzhen Mech Valve Trading Co., Ltd. also has an extensive line of products as wedge gate valve.
For Shenzhen Mech Valve Trading Co., Ltd. as a whole to adopt an attitude of acceptance toward change and technological innovation, we first have to truly embrace it and practice what they preach. Technological development needs to be more than just another investment, but a complete integration.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: