Youngsters who certificate no. 351 [2016] of the

National Energy Administration on strengthening the supervision and administration of power generation enterprise license

matters related to inform

each sent energy regulator, the provinces, autonomous regions and municipalities directly under the central government, xinjiang production and construction corps, National Development and Reform Commission ( Energy bureau) , the letter committee, the state grid corporation, southern power grid company, Inner Mongolia electric power ( Group) Co. , LTD. , huaneng, datang, huadian group co. , LTD, guodian, national electric shots, shenhua group, China coal group, investment group, China resources group, the electric power enterprise:

in order to further implement the State Council and decentralization, combined the pipes, the relevant functional transformation, optimization services, strict electric power business license system, speed up eliminating backward production capacity, promote renewable energy development, give full play to the license's role in regulating the behavior of the electric power enterprise operation, and now the matters related to notice the following:

a, licensing system, strictly investigate unlicensed operation behavior

except in the case where the National Energy Administration clear waiver, generating set must obtain electric power business license shall be connected to the grid.

send energy regulator for each parallel operation of the generator set to carry out the screening work within their respective jurisdictions, has not obtained permission to grid power seriously.

( A) To has not obtained a license generator of affiliated companies issued immediately order the rectification notice, request related companies must be on December 31, 2016 to send energy regulatory approval formalities; Still has not obtained before June 30, 2017 unit electric power business license shall not be power on the Internet, refused to carry out, according to the electricity regulatory ordinance ( Order no. 432 of the State Council of the People's Republic of China) , the electric power business license management regulations ( The state electricity regulatory commission no. 9) Dealt with relevant provisions, in accordance with the law.

( 2) To perform related requirements, cooperate with relevant regulatory work of power grid enterprise, give notification criticism, refused to perform, dealt with in accordance with the law.

send energy regulator units have to has not obtained a license to promptly notify the local government authorities.

2, strengthen the regulation of licensing overterm service unit, clear generators continue running the relevant requirements of

generators to run to meet the design of use fixed number of year, shall apply to the local dispatched energy regulator retirement, may not continue to grid power. Fails to apply for retirement, published by sending energy regulator and cancellation of license in accordance with the law.

generator set in line with national industrial policy and policy, energy saving and emission reduction is not incorporated in the plan for relevant government departments to shut down or stop, if you want to apply for the continuation of operation, should be in unit 3 months prior to the expiry of the design life to the local dispatched energy regulator application continues to run. Coal unit according to the National Energy Administration concerning the subcritical coal unit reformation, prolong life and retired interim provisions notice ( Youngsters who power [2015] no. 332) Documents related requirements, applying to the continuation of the runtime shall provide relevant proofs with yanshou modification, the safety assessment, sent energy regulator according to the proof in the specific time limit granted its continuation. Other types of generating set application continues to run, should also be in accordance with the relevant provisions of the state and local in yanshou reformation, safety assessment, and provide the corresponding proof.

with the safety supervision and administration department should strengthen the overterm service safety supervision and administration of the unit.

three units, standardization of the new generation (dg) requirements

new generator set in three months after the startup commissioning time points, must obtain a electric power business license ( Power generation class) Late (without electric power business license Power generation class) May not power on the Internet, refused to carry out, by sending energy regulator dealt with in accordance with the law.

4, adjust the exemption of small hydropower station

small hydropower station's power generation business license exemption from a single station installed capacity of 1 mw ( Do not contain) The following to adjust to the single station installed capacity of 6 mw ( Do not contain) The following. Relevant enterprises and units or individual business single station of 6 mw ( Do not contain) Small hydropower station under power generation business, no longer required to obtain the business license for generating electric power.

the exemption approved power projects the interconnection formalities and subsequent supervision and management of related matters, in accordance with the National Energy Administration of clear electric power business license notice matters related to the management of ( It qualifications (2014) no. 151) And the provisions of the relevant documents, requirements is carried out.

from the date of publishing the implementation of this circular, this circular issued before the electric power business license management files are inconsistent with this notice, in accordance with this notice.

the National Energy Administration

on December 8, 2016.